Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/naaqwaco/kebarco/wp-includes/functions.php on line 6114
Technical Simulation - Kebarco

Technical Simulation

Well Control Simulation is becoming a very useful tool for managing risks and making critical well control decisions. A fully time transient, two phase flow simulator provides a number of technology improvement over conventional steady state models such as Drilling, workover, stuck pipe and well control.

Providing a more comprehensive well control scenario program; gives our trainees the practical experience to be prepared for the daily applications they delegate to.

Focusing on the interaction between crew members in various functions on the rig was pointed out as a key factor in dealing with well control scenarios.

Please contact us for further details